Announced

Rhea Data Blacks Creek Data Center Campus (Arevia Power)

Ada County, ID

Rhea Data Blacks Creek Data Center Campus (Arevia Power) is an announced data center project in Ada County, ID, backed by Rhea Data (subsidiary of Arevia Power). Rhea Data, a subsidiary of Nevada renewable developer Arevia Power, applied to the BLM in Sept 2026 for a multi-building hyperscale campus of roughly 4 million sq ft on ~3,700 acres of federal land off the Blacks Creek exit, with an on-site natural gas power plant and possible solar supply from near Twin Falls. It would be the first data center proposed on Idaho public land and 4-5x the size of Meta's Kuna campus. BLM is running the application/NEPA process; Boise Mayor McLean and the Sierra Club oppose it. (Source dated 2026-09-21.).

Rhea Data Blacks Creek Data Center Campus (Arevia Power) in Ada County, ID
Aerial imagery: USGS The National Map (public domain)

Project status

  1. Announced
  2. Permitting
  3. Under constructionNot yet
  4. OperationalNot yet

Recorded changes

Nothing recorded yet. Follow this project to hear when something changes.

Community sentiment

Should this project be built?

Do you live nearby?

What’s next

Election Day is in 11 days.

  1. Election Day

Latest news

Nothing written about this data center yet. The latest from Ada County, ID:

  1. Boise mayor blasts ‘shortsighted’ push for ‘mega data center’ on public lands

    spokesman.com

See all news

Records and documentation

Idaho state legislation

Site details

Address
Ada County, ID
Stage
Announced

Capacity and size: not on file

Map

Photos

Talk about this data center on the Ada County page Stories, questions and the neighbors who live near it.

Other data centers near Ada County

All data centers in Ada County, Idaho

For data center developers

Claim this Page

I am a stakeholder for this data center, and I would like to provide updated information.

It's free to participate.

Join a growing community.

Free · takes a minute · your ZIP code stays private