Aligned PHX-13
Phoenix, Maricopa County, AZ
Aligned Data Centers, a private operator, is building Aligned PHX-13 in Phoenix, AZ. Reported capacity is 72 MW. 72MW hyperscale facility; APS building a new 230kV transmission line for the campus. Reported 2025. [Reviewed 2026-10-09: verified] Groundbreaking occurred April 15, 2025; multiple credible sources confirm 72MW facility, APS 230kV transmission line, and under-construction status. Source: https://www.constructconnect.com/construction-economic-news/aligned-data-centers-breaks-ground-on-phx-13-facility-expanding-arizona-infrastructure.
- 72 MWPlanned capacity
Project status
- Announced
- Permitting
- Under construction Apr 15, 2025
- Operational
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 11 days.
12:30 AM · Phoenix, AZ
Demand No Data Centers in AZ - With Postcards!
Latest news
Nothing written about this data center yet.
Stories about it, and about Maricopa County, AZ, land here.
Records and documentation
Arizona state legislation
- Council Vote — Denial of AI Data Center Special Use ApplicationChandler City Council denied a special-use application for an AI data center project in December 2025.Download
- ACC Docket E-01345A-25-0105 - APS 2025 General Rate Case (Data Center Rate Class)Filed June 2025, seeking ~14-16% base rate increase including a 45%+ rate increase specifically for "extra-large energy users" (data centers) and a proposed annual true-up mechanism largely tied to data-center-driven load growth.Download
- Pima County Memorandum of Agreement (Project Blue / Humphreys Peak Properties)Binding MOA between Pima County and Humphreys Peak Properties for the 'Project Blue' data center development.Download
- Ordinance No. 5033 (Zoning Code Ch. 35, Sec. 2214)One of the earliest data center zoning ordinances in the US, enacted by Chandler, AZ in December 2022.Download
- ACC Docket E-00000A-25-0069 - Inquiry into Data Center Rate ClassificationsOpened April 2025 -- commission-wide inquiry into rate classification and cost-allocation policy for data centers/large loads ("Growth Pays for Growth"). Workshop held April 2026.Download
- HB2949 - Energy costs; large data centersDescription comingDownload
- HB2452 - Comprehensive plans; data centers; nuclearDescription comingDownload
Site details
- Operator
- Aligned Data Centers
- County
- Maricopa County, AZ
- Capacity
- 72 MW
- Address
- Phoenix, AZ
- Stage
- Under construction
Size: not on file
Map
Photos
Aerial imageryUSGS The National Map · public domain
Resistance to this data hub in Phoenix is futile. Here's whyThe Arizona Republic
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Phoenix
For data center developers