Starbucks Center / 2401 Utah Ave S data center (Sodo)
Seattle, King County, WA
Starbucks Center / 2401 Utah Ave S data center (Sodo) is an announced data center project in Seattle, WA, backed by Colossus Data Center Advisors. Early-stage (other). A conceptual site plan has been filed with Seattle for a sub-20 MW data center in the former Amazon Fresh retail and distribution space at 2401 Utah Ave. S, the building that houses Starbucks' headquarters. It sits just under the size cap in Seattle's one-year moratorium on large data centers, and no tenant has been secured. About 20 MW. Not confirmed by the developer or local officials; location approximate. Sources: https://www.datacenterdynamics.com/en/news/20mw-data-center-proposed-in-starbucks-seattle-hq-building-in-washington/ https://morethanjustparks.com/data-center-tracker/starbucks-center-data-center-colossus-data-center-advisors-sodo-wa--c27ef004-91ef-403f-a72c-9dad734ae0f6.
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about King County, WA, land here.
Records and documentation
Washington state legislation
- WUTC Docket UE-161123 - Puget Sound Energy Special Contract with Microsoft (Redmond)Special contract (effective 2017, still active with ongoing compliance filings) letting Microsoft buy renewable/carbon-free energy directly from wholesale markets for its Redmond corporate campus while using PSE only for grid delivery -- Microsoft remains PSE's only electric special-contract customer.Download
- HB824 - Data center energy generation/storage reportingRequires reporting on data center energy generation and storage.Download
- HB2515 - Emerging large energy use facilitiesRegulates emerging large energy-use facilities such as data centers.Download
- Resolution 32204Companion Seattle City Council resolution on data center policy, adopted June 9, 2026.Download
- HB2992 - Data Center Customer Protection Act of 2026Establishes customer protections related to data center utility costs.Download
- HB2655 - Sales/use tax exemption for eastern Washington data centersProvides retail sales and use tax exemption for construction and equipping of new data centers in eastern Washington counties.Download
- HB1012 - Local permit freeze on new data center constructionProhibits local governments from issuing permits, licenses, or certificates for new data center construction until March 1, 2027.Download
- Ordinance 127447Seattle ordinance and moratorium on data center permitting, passed June 9, 2026, effective through June 2027.Download
- WUTC Docket UE-260162 - Large Load Interconnections for Regulated Electric UtilitiesCommission-led policy docket opened 2026 addressing data-center/large-load interconnection and tariff policy for PSE and Avista; draft policy statement expected fall 2026. Most WA data-center load (Quincy/Wenatchee area) sits with consumer-owned PUDs outside WUTC jurisdiction, which this docket does not reach.Download
Site details
- Operator
- Colossus Data Center Advisors
- County
- King County, WA
- Address
- Seattle, WA
- Stage
- Announced
Capacity and size: not on file
Map
Photos
Aerial imageryUSGS The National Map · public domain
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Seattle
For data center developers