EdgeConneX Seattle (EDCSEA01)
Tukwila, King County, WA
EdgeConneX Seattle (EDCSEA01) is an operating data center in Tukwila, WA, run by EdgeConneX Inc. The facility is reported at 4.5 MW. EdgeConneX Inc operates this data center at 3425 S 116th St Building 6 Suite 133, Tukwila, WA 98168. It covers 47,000 square feet and has 4.5 MW of capacity.
- 4.5 MWPlanned capacity
Project status
- Announced
- Permitting
- Under construction
- Operational
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
This data center is operating.
The stance question is asked on projects still ahead.
What’s next
Election Day is in 11 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about King County, WA, land here.
Records and documentation
Washington state legislation
- WUTC Docket UE-161123 - Puget Sound Energy Special Contract with Microsoft (Redmond)Special contract (effective 2017, still active with ongoing compliance filings) letting Microsoft buy renewable/carbon-free energy directly from wholesale markets for its Redmond corporate campus while using PSE only for grid delivery -- Microsoft remains PSE's only electric special-contract customer.Download
- HB824 - Data center energy generation/storage reportingRequires reporting on data center energy generation and storage.Download
- HB2515 - Emerging large energy use facilitiesRegulates emerging large energy-use facilities such as data centers.Download
- Resolution 32204Companion Seattle City Council resolution on data center policy, adopted June 9, 2026.Download
- HB2992 - Data Center Customer Protection Act of 2026Establishes customer protections related to data center utility costs.Download
- HB2655 - Sales/use tax exemption for eastern Washington data centersProvides retail sales and use tax exemption for construction and equipping of new data centers in eastern Washington counties.Download
- HB1012 - Local permit freeze on new data center constructionProhibits local governments from issuing permits, licenses, or certificates for new data center construction until March 1, 2027.Download
- Ordinance 127447Seattle ordinance and moratorium on data center permitting, passed June 9, 2026, effective through June 2027.Download
- WUTC Docket UE-260162 - Large Load Interconnections for Regulated Electric UtilitiesCommission-led policy docket opened 2026 addressing data-center/large-load interconnection and tariff policy for PSE and Avista; draft policy statement expected fall 2026. Most WA data-center load (Quincy/Wenatchee area) sits with consumer-owned PUDs outside WUTC jurisdiction, which this docket does not reach.Download
Site details
- Operator
- EdgeConneX Inc.
- County
- King County, WA
- Capacity
- 4.5 MW
- Address
- Tukwila, WA
- Stage
Size: not on file
Map
Photos
https://pop.he.net/images/us-wa-seattle-edgeconnex-edcsea01.jpg
Google Street View
Google Street View
Google Street View
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Tukwila
For data center developers