STACK Infrastructure Goldendale Data Center
Goldendale, Klickitat County, WA
A new data center, STACK Infrastructure Goldendale Data Center, has been announced in Goldendale, WA. The project is sized at 1,100 MW. Colorado-based STACK Infrastructure is proposing a 1,100MW data center campus in Goldendale, Klickitat County, on the former Lockheed Martin Aluminum smelter site owned by Scott Tillman's NSC Smelter LLC, adjacent to the proposed Goldendale Energy Storage (pumped-hydro) Project. Disclosed via Washington Dept. of Ecology documents; opposed by the Yakama Nation over impacts to the culturally significant Pushpum site.
- 1,100 MWPlanned capacity
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet. The latest from Klickitat County, WA:
Records and documentation
Washington state legislation
- WUTC Docket UE-161123 - Puget Sound Energy Special Contract with Microsoft (Redmond)Special contract (effective 2017, still active with ongoing compliance filings) letting Microsoft buy renewable/carbon-free energy directly from wholesale markets for its Redmond corporate campus while using PSE only for grid delivery -- Microsoft remains PSE's only electric special-contract customer.Download
- HB824 - Data center energy generation/storage reportingRequires reporting on data center energy generation and storage.Download
- HB2515 - Emerging large energy use facilitiesRegulates emerging large energy-use facilities such as data centers.Download
- Resolution 32204Companion Seattle City Council resolution on data center policy, adopted June 9, 2026.Download
- HB2992 - Data Center Customer Protection Act of 2026Establishes customer protections related to data center utility costs.Download
- HB2655 - Sales/use tax exemption for eastern Washington data centersProvides retail sales and use tax exemption for construction and equipping of new data centers in eastern Washington counties.Download
- HB1012 - Local permit freeze on new data center constructionProhibits local governments from issuing permits, licenses, or certificates for new data center construction until March 1, 2027.Download
- Ordinance 127447Seattle ordinance and moratorium on data center permitting, passed June 9, 2026, effective through June 2027.Download
- WUTC Docket UE-260162 - Large Load Interconnections for Regulated Electric UtilitiesCommission-led policy docket opened 2026 addressing data-center/large-load interconnection and tariff policy for PSE and Avista; draft policy statement expected fall 2026. Most WA data-center load (Quincy/Wenatchee area) sits with consumer-owned PUDs outside WUTC jurisdiction, which this docket does not reach.Download
Site details
- Operator
- STACK Infrastructure
- County
- Klickitat County, WA
- Capacity
- 1,100 MW
- Address
- Goldendale, WA
- Stage
- Announced
Size: not on file
Map
Photos
RenderingImage via columbiainsight.org
RenderingImage via columbiainsight.org
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Rural Klickitat County faces surge in data center proposalsSpokane Spokesman-Review
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Goldendale
For data center developers