NorthPoint Development Fairfield Data Center (Vanden Road)
Fairfield, Solano County, CA
Plans have been filed for NorthPoint Development Fairfield Data Center (Vanden Road), a data center in Fairfield, CA. The project is sized at 150 MW. NorthPoint Development is planning a data center of roughly 150 MW within its ~300-acre Vanden Road industrial park in Fairfield, reported in August 2026. The project is in early planning and Solano County voters face a November 2026 tax measure intended to discourage data centers. (Source dated 2026-08-17.).
- 150 MWPlanned capacity
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about Solano County, CA, land here.
Records and documentation
California state legislation
- CPUC Resolution E-5420 - PG&E Service to STACK Infrastructure (San Jose)Approved PG&E special facilities/service arrangement for a 90MW STACK Infrastructure data center in San Jose.Download
- CPUC Resolution E-5439 - PG&E Service to Microsoft "SJC02" (San Jose)Approved PG&E special facilities/service arrangement for a 90MW Microsoft data center campus in San Jose.Download
- CPUC Application A.24-11-007 - PG&E Electric Rule 30 Revision (Large Transmission-Load Tariff)PG&E-filed revision to Electric Rule 30 creating tariff terms for large transmission-voltage loads (data centers), including minimum-take and collateral provisions.Download
- SB 886 - Data center electricity rates: separate rate classCreates a separate electricity rate class for data centers.Download
- SB6231 - Removes data center equipment replacement tax exemptionRemoves the tax exemption for replacement of data center equipment.Download
- SB 2406 - Data center nondisclosure agreement penaltiesEstablishes penalties for data center nondisclosure agreements.Download
- SB960 - Data center electric cost allocation studyDirects the SCC to determine whether non-data-center customers subsidize data centers.Download
- HB05076 - AI data center energy/water efficiency requirementsConcerns energy and water efficiency requirements for AI data centers.Download
- SB 887California bill removing CEQA categorical exemptions as applied to data center projects.Download
- S08540 - Accountability of Costs for Data Centers ActEstablishes independent classification of service for large energy-use facilities to allocate data center costs.Download
- HB1246 - Prohibits nondisclosure of data center agreementsProhibits nondisclosure of certain agreements related to data centers.Download
- SB 1168 - Data centers: rate structuresEstablishes rate structures applicable to data centers.Download
- CPUC Rulemaking R.26-04-009 - Advanced Rate Design (Large Load / Data Center Cost Allocation)Statewide rulemaking opened 2026, driven by SB 57, addressing cost allocation and rate design for large-load customers including data centers.Download
- CPUC Advice Letter 7785-E / Draft Resolution E-5455 - PG&E Service to Google (San Jose, 250MW)Pending as of Sep 2026 -- PG&E advice letter for a 250MW Google data center in San Jose, protested by the Public Advocates Office over ratepayer cost allocation.Download
- AB2469 - Data centers: water use disclosures.Description comingDownload
- AB1095 - Data centers: waste heat energy.Description comingDownload
- AB93 - Water resources: data centers.Description comingDownload
- SB57 - Electrical corporations: data centers: report.Description comingDownload
- AB2619 - Water resources: data centers.Description comingDownload
- SB978 - Data centers: labor: electricity rates.Description comingDownload
- AB1577 - Data centers: reporting.Description comingDownload
- AB2383 - Electricity: data centers.Description comingDownload
- AB222 - Data centers: power usage effectiveness: cost shifts.Description comingDownload
Site details
- Operator
- NorthPoint Development
- County
- Solano County, CA
- Capacity
- 150 MW
- Address
- Fairfield, CA
- Stage
- Planned
Size: not on file
Map
Photos
Aerial imageryUSGS The National Map · public domain
California and Texas Announce Restrictions on Data Center DevelopmentBusiness Insider
Newsom signs ‘most comprehensive data center laws’ in USSanta Rosa Press Democrat
California tightens rules on AI data center energy and water useThe Verge
California enacts data center laws giving communities more control over facilitiesCBS News
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Fairfield
For data center developers