Announced

TerraVolt Southeast Idaho Campus (Raft River)

Raft River / Malta area, Cassia County, ID

TerraVolt Infrastructure (CalEthos) has announced TerraVolt Southeast Idaho Campus (Raft River), a data center project in Raft River / Malta area, ID. Reported capacity is 240 MW. TerraVolt Infrastructure (a CalEthos company) is planning a master-planned AI data center campus in the Raft River area of Cassia County, powered by its own behind-the-meter gas generation; it signed with Williams' Northwest Pipeline for gas supply in May 2026. Initial phase reported at 240 MW with a 300 MW buildout figure. Local residents in Declo/Albion raised aquifer concerns in mid-2026; the Idaho data center sales-tax exemption effective date was reportedly adjusted to accommodate the project. (Source dated 2026-05-12.).

  • 240 MWPlanned capacity
TerraVolt Southeast Idaho Campus (Raft River) in Raft River / Malta area, ID
Aerial imagery: USGS The National Map (public domain)

Project status

  1. Announced
  2. Permitting
  3. Under constructionNot yet
  4. OperationalNot yet

Recorded changes

Nothing recorded yet. Follow this project to hear when something changes.

Community sentiment

Should this project be built?

Do you live nearby?

What’s next

Election Day is in 11 days.

  1. Election Day

Latest news

Nothing written about this data center yet.

Stories about it, and about Cassia County, ID, land here.

Records and documentation

Idaho state legislation

Site details

Capacity
240 MW
Address
Raft River / Malta area, ID
Stage
Announced

Size: not on file

Map

Photos

Talk about this data center on the Cassia County page Stories, questions and the neighbors who live near it.

Other data centers near Raft River / Malta area

All data centers in Cassia County, Idaho

For data center developers

Claim this Page

I am a stakeholder for this data center, and I would like to provide updated information.

It's free to participate.

Join a growing community.

Free · takes a minute · your ZIP code stays private