Raeden Gibraltar data center (McLouth Steel site)
Gibraltar, Wayne County, MI
Raeden Gibraltar data center (McLouth Steel site), a data center project in Gibraltar, MI, has stalled. The facility is reported at 100 MW. Raeden proposed a 100MW inference data center reusing existing buildings at the former McLouth Steel site, 27800 W. Jefferson Ave., Gibraltar, Wayne County, with a substation planned on the adjacent Superfund parcel at 28000 W. Jefferson. Application submitted mid-Feb 2026; Gibraltar City Council passed a one-year data center moratorium March 9, 2026 that activists say targeted this application; Raeden sued the city in federal court in August 2026 over the moratorium. Distinct from the already-tracked, already-operating 'Raeden Michigan 1' facility in Detroit -- same operator, different site.
- 100 MWPlanned capacity
Project status
- Announced
- Stalled
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet. The latest from Wayne County, MI:
Records and documentation
Michigan state legislation
- One-Year Moratorium ResolutionCity of Saline, Michigan one-year data center moratorium, enacted January 2026, active through January 2027.Download
- Emergency Ordinance No. 1461 (60-day moratorium)Ypsilanti, Michigan emergency 60-day data center moratorium, passed April 21, 2026.Download
- 180-Day Moratorium ResolutionSpringfield Township, Michigan 180-day data center moratorium, passed October 2025, expired April 2026.Download
- MPSC Case No. U-21859 - Consumers Energy Large-Load TariffConsumers Energy's large-load/data-center customer tariff proceeding, Michigan's second major utility to establish this rate class.Download
- MPSC Case No. U-21990 - DTE Energy Large-Load Tariff (Related Digital / Oracle, Saline Township)DTE Energy large-load tariff proceeding naming the 1.38GW Related Digital/Oracle "Stargate Michigan" project in Saline Township; an Attorney General appeal is pending.Download
- MPSC Case No. U-22061 - DTE Energy Large-Load TariffDTE Energy large-load/data-center customer tariff proceeding, follow-on to U-21990.Download
- HB5982 - Public utilities: other; contracts to service data centers; require to be treated as a contested case. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 6bb.Description comingDownload
- HB5398 - Property tax: exemptions; general property tax act; reflect repeal of data center tax exemptions. Amends sec. 7ff of 1893 PA 206 (MCL 211.7ff). TIE BAR WITH: HB 5396'25, HB 5397'25Description comingDownload
- HB5791 - Use tax: other; requirements for enterprise data centers; modify. Amends sec. 4cc of 1937 PA 94 (MCL 205.94cc).Description comingDownload
- HB6252 - Businesses: other; thermal impact assessment requirements for certain data centers; provide for. Creates new act.Description comingDownload
- HB5790 - Local government: financing; requirements for enterprise data centers; modify. Amends sec. 4ee of 1933 PA 167 (MCL 205.54ee).Description comingDownload
- HB6251 - Businesses: other; energy infrastructure and thermal management evaluation requirements for certain data centers; provide for. Creates new act.Description comingDownload
- HB5787 - Sales tax: exemptions; compliance with enterprise data center construction labor act; require. Amends sec. 4ee of 1933 PA 167 (MCL 205.54ee). TIE BAR WITH: HB 5785'26, HB 5786'26Description comingDownload
- SB1179 - Energy: other; reporting requirements for data centers; provide for. Creates new act.Description comingDownload
- SB0762 - Energy: other; energy and water usage report requirements for data centers; provide for. Amends sec. 5a of 1939 PA 3 (MCL 460.5a).Description comingDownload
- HB6142 - Businesses: other; requirements for data center decommissioning, dismantling, and remediation; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10jj. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6139'26Description comingDownload
- HB5785 - Use tax: exemptions; compliance with enterprise data center construction labor act; require. Amends sec. 4cc of 1937 PA 94 (MCL 205.94cc). TIE BAR WITH: HB 5786'26, HB 5787'26Description comingDownload
- HR0240 - A resolution to urge a temporary pause on discretionary state-level incentives for data center construction, request a comprehensive review of the fiscal, utility, environmental, and local governance impacts of data center development in Michigan, and direct House committees to review these issues.Description comingDownload
- HB5777 - Businesses: other; large-scale data center life cycle financial responsibility act; create. Creates new act.Description comingDownload
- HB5846 - Land use: zoning and growth management; zoning overlay districts for data centers; provide for. Creates new act.Description comingDownload
- HB5595 - Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centers; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii.Description comingDownload
- SB1018 - Businesses: other; moratorium on certain approvals for and operation of any new data centers; provide for. Creates new act. TIE BAR WITH: SB 1019'26Description comingDownload
- HB5594 - Businesses: other; moratorium on certain approvals for and operation of any new data centers; provide for. Creates new act. TIE BAR WITH: HB 5596'26Description comingDownload
- HB5882 - Local government: other; requirements for a moratorium imposed by a local unit of government on large-scale data centers or cryptocurrency mining facilities; provide for. Creates new act. TIE BAR WITH: HB 5881'26Description comingDownload
- SB1020 - Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centers; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii.Description comingDownload
Site details
- Operator
- Raeden
- County
- Wayne County, MI
- Capacity
- 100 MW
- Address
- Gibraltar, MI
- Stage
- Stalled
Size: not on file
Map
Photos
RenderingPhoto: Planet Detroit
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
RenderingPhoto: Planet Detroit
$75M data center plan scrapped in Wayne County after residents pack City HallM Live Michigan
Massive Google data center approved in Wayne County despite residents’ oppositionM Live Michigan
DTE gets green light to power massive Google data centerM Live Michigan
Wayne County executive vetoes $125M tax break for Google data centerM Live Michigan
Moratorium fight: Developer claims Gibraltar unlawfully stopped data center, takes legal routeWDIV ClickOnDetroit
Inkster residents pack city hall to oppose data center - council declines to approve itWDIV ClickOnDetroit
ComEd customers could pay billions for data center hookups, warns utility watchdog groupShaw Local Enewspapers
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
Other data centers near Gibraltar
For data center developers