Project Horizon (Longfellow Ranch)
Fort Stockton, Pecos County, TX
Poolside, a private operator, is building Project Horizon (Longfellow Ranch) in Fort Stockton, TX. Reported capacity is 2,000 MW on a site of about 657 acres. 2GW self-powered AI campus ~25mi from Fort Stockton adjacent to Longfellow Ranch gas hub; eight 250MW phases; CoreWeave anchor deal for phase 1 later unwound (2026).
- 2,000 MWPlanned capacity
- 657 acresSite size
Project status
- Announced Oct 15, 2025
- Permitting
- Under construction
- Operational
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 11 days.
7:00 AM · TX
Pecos County: Commissioners Court
Latest news
Nothing written about this data center yet.
Stories about it, and about Pecos County, TX, land here.
Records and documentation
- Pecos County Commissioners Court Agenda, 1/12/2026 — Tax Abatement Agreement with CoreWeave, LLC (Longfellow Renewable Energy Reinvestment Zone)Official agenda item approving a Chapter 312 tax abatement with CoreWeave LLC in the Longfellow Renewable Energy Reinvestment Zone (established 1/13/2025). The signed agreement PDF itself is not linked, likely only available via the County Auditor.Download
- Fort Stockton Pioneer: Pecos County commissioners approve tax relief for $6.4B data center dealNews coverage of the Commissioners Court tax-abatement approval above.Download
- Fort Stockton Pioneer: Multi-billion dollar AI project and new workforce housing greenlit in Pecos County559-acre footprint 25 miles outside Fort Stockton, adjacent to Longfellow Ranch, unincorporated Pecos County, behind-the-meter power generation.Download
Texas state legislation
- PUCT Project No. 58481 - Large Load Interconnection Standards Rulemaking (PURA §37.0561)Statewide rulemaking adopting 16 TAC §25.194, interconnection standards for new/expanding loads ≥75MW (data centers). Adopted 2026 with a flat $100k study fee, eliminated non-refundable interconnection fee.Download
- PUCT Docket No. 59475 - Oncor/LCRA Bell County East Switch-Big Hill 765kV Transmission LineFiled March 2026; 122 alternative routes, 835+ protests. Explicitly justified by data-center load concentration in the Temple/Bell/Williamson County corridor; an intervenor has questioned whether specific "Temple Data Centers" were properly included in the load forecast.Download
- PUCT Docket No. 59142 - ERCOT Large Load Interconnection "Batch Zero" ProcessPUCT approved (~June 2026) ERCOT's one-time transitional study process for ≥75MW load interconnection requests; tied to Gov. Abbott's Aug 2026 directive pausing/auditing the queue. CenterPoint reported ~14GW of its own projects positioned in this batch.Download
- Economic Development Program Agreement (Seafox) / Tax Abatement & Road Improvements AgreementsMOU-based economic development program agreement (plus a Chapter 312 tax abatement agreement and a road-improvements development agreement) covering a data center project in El Paso.Download
- PUCT Docket No. 59399 - Comanche Peak Power Company Net Metering Application (Amazon)Pending as of mid-2026 -- test case for data center co-location against dispatchable (nuclear) generation. Amazon data center campus paired with the Comanche Peak nuclear plant, Somervell County.Download
Site details
- Operator
- Poolside
- County
- Pecos County, TX
- Capacity
- 2,000 MW
- Size
- 657 acres
- Address
- Fort Stockton, TX
- Stage
- Under construction
Map
Photos
RenderingPhoto: Forbes
Aerial imageryAerial imagery: USGS The National Map (public domain)
Blue Origin’s $600 million Space Coast expansion to bring 500 jobs, state saysSpokane Spokesman-Review
Jeff Bezos' Blue Origin Expands Florida Rocket Facility Footprint, Ron DeSantis Touts State's 'Ideal EnviBenzinga
Developer Calls GW Ranch in Pecos County, Texas, the ‘Largest Power Project’ in U.S.Inside Climate News
Kevin Costner's 'Horizon' ignites legal battle after box office bombNew York Post
Is Kevin Costner's career disappearing over the Horizon?New York Post
The Real Reason Kevin Costner Keeps Making Westerns/FILM
It took 3 months to get inside this massive Texas data center - here’s what we sawFOX 4 News
Texas AG Ken Paxton Sends Compliance Letters to 156 Data Centers over Water Usage ReportingBreitbart News Network
156 Texas data centers warned to comply with water use reporting requirementsFOX 4 News
Texas Agency Tries To Keep Data Centers Hidden Over Terror FearsNewsweek
Texas puts data center permits on hold.The Verge
Gov. Abbott pauses new data center permits until water, power audit completeCBS News
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Fort Stockton
For data center developers