New Haven (Allen County) data center is a planned data center in New Haven, IN. Reported capacity is 500 MW. Rumored / unconfirmed: Cleanview and AI Law Tracker list a 500 MW proposed data center in New Haven, Allen County (east of Fort Wayne), operator undisclosed. Allen County/Fort Wayne were considering a one-year study pause in mid-2026.
- 500 MWPlanned capacity
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 11 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about Allen County, IN, land here.
Records and documentation
Indiana state legislation
- IURC Cause No. 46097 - Indiana Michigan Power (AEP) Large-Load TariffIURC approved (Feb 2025) a modified large-load tariff for new/expanding loads >70MW single-site: 12-year minimum term, 80% minimum-billing-demand floor, 24-month collateral, exit fee. Settling parties included OUCC, Amazon, Google, Microsoft, Data Center Coalition -- driven by AWS's ~$11B "Project Rainier" (New Carlisle) and Google's Fort Wayne data center.Download
- IURC Cause No. 46183 - NIPSCO GenCo Dedicated-Generation FrameworkIURC approved (Sept 2025, reaffirmed Nov 2025) a settlement letting GenCo (a NIPSCO affiliate) own/build dedicated generation for large loads so existing customers aren't cost-burdened. Built to serve Amazon data centers.Download
- IURC Cause No. 46322 - NIPSCO/GenCo Special Contract + PPA (Amazon)Order issued June 2026 -- GenCo to build two 1.3GW gas plants + 400MW/4hr battery storage, power delivery to Amazon starting Jan 2027 ramping to 2.4GW by 2032. NIPSCO projects ~$1B ratepayer savings.Download
- IURC Cause No. 45647 - Duke Energy Indiana TDSIC (Meta Jeffersonville Cost Recovery)Ongoing transmission/distribution infrastructure cost-recovery docket; ~$216M of network upgrades tied to the Meta Jeffersonville data center were recovered through this mechanism, later reviewed by the Indiana Supreme Court on cost allocation.Download
- SB0079 - Data center development.Description comingDownload
- HB1245 - IURC study of data centers.Description comingDownload
Site details
- Operator
- Not announced
- County
- Allen County, IN
- Capacity
- 500 MW
- Address
- New Haven, IN
- Stage
- Planned
Size: not on file
Map
Photos
Google Street View · nearby land, not the exact site
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near New Haven
For data center developers