Meta Lebanon campus (LEAP Innovation District)
Lebanon, Boone County, IN
Construction is under way on Meta Lebanon campus (LEAP Innovation District) in Lebanon, IN. The project is sized at 1,000 MW with an estimated investment of $10 billion. Broke ground Feb 2026; 13 buildings / 4M sq ft on ~1,500 acres in Boone County; first buildings online end of 2027.
- 1,000 MWPlanned capacity
Project status
- Announced
- Permitting
- Under construction Feb 11, 2026
- Operational
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 11 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about Boone County, IN, land here.
Records and documentation
Indiana state legislation
- IURC Cause No. 46097 - Indiana Michigan Power (AEP) Large-Load TariffIURC approved (Feb 2025) a modified large-load tariff for new/expanding loads >70MW single-site: 12-year minimum term, 80% minimum-billing-demand floor, 24-month collateral, exit fee. Settling parties included OUCC, Amazon, Google, Microsoft, Data Center Coalition -- driven by AWS's ~$11B "Project Rainier" (New Carlisle) and Google's Fort Wayne data center.Download
- IURC Cause No. 46183 - NIPSCO GenCo Dedicated-Generation FrameworkIURC approved (Sept 2025, reaffirmed Nov 2025) a settlement letting GenCo (a NIPSCO affiliate) own/build dedicated generation for large loads so existing customers aren't cost-burdened. Built to serve Amazon data centers.Download
- IURC Cause No. 46322 - NIPSCO/GenCo Special Contract + PPA (Amazon)Order issued June 2026 -- GenCo to build two 1.3GW gas plants + 400MW/4hr battery storage, power delivery to Amazon starting Jan 2027 ramping to 2.4GW by 2032. NIPSCO projects ~$1B ratepayer savings.Download
- IURC Cause No. 45647 - Duke Energy Indiana TDSIC (Meta Jeffersonville Cost Recovery)Ongoing transmission/distribution infrastructure cost-recovery docket; ~$216M of network upgrades tied to the Meta Jeffersonville data center were recovered through this mechanism, later reviewed by the Indiana Supreme Court on cost allocation.Download
- SB0079 - Data center development.Description comingDownload
- HB1245 - IURC study of data centers.Description comingDownload
Site details
- Operator
- Meta
- County
- Boone County, IN
- Capacity
- 1,000 MW
- Address
- Lebanon, IN
- Stage
- Under construction
Size: not on file
Map
Photos
https://cdn.ibj.com/wp-content/uploads/2026/02/Final_View_04-1024x576.jpg
Google Street View
Google Street View
Google Street View
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Lebanon
For data center developers