Global Stack Southern California Fair (Perris) Edge Data Center
Perris, Riverside County, CA
Global Stack Southern California Fair (Perris) Edge Data Center is an announced data center project in Perris, CA, backed by Global Stack LLC (MeshClusters). The record lists an estimated investment of $20 million. Global Stack pitched a container-sized edge data center at the state-owned Southern California Fairgrounds in Perris. Residents opposed it and the Perris Planning Commission on Sept. 17, 2026 recommended a citywide data center ban; the developer says the unit is the size of a shipping container. (Source dated 2026-09-17.) [Reviewed 2026-10-09: verified] Global Stack LLC has a nonbinding agreement approved by the fairgrounds board to explore an edge data center at the Southern California Fair and Events Center in Perris; project remains in early stages with no construction approved. Source: https://www.kvcrnews.org/local-news/2026-09-17/perris-planning-commission-recommends-data-center-ban-as-residents-oppose-state-fairgrounds-project.
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet.
Stories about it, and about Riverside County, CA, land here.
Records and documentation
California state legislation
- CPUC Resolution E-5420 - PG&E Service to STACK Infrastructure (San Jose)Approved PG&E special facilities/service arrangement for a 90MW STACK Infrastructure data center in San Jose.Download
- CPUC Resolution E-5439 - PG&E Service to Microsoft "SJC02" (San Jose)Approved PG&E special facilities/service arrangement for a 90MW Microsoft data center campus in San Jose.Download
- CPUC Application A.24-11-007 - PG&E Electric Rule 30 Revision (Large Transmission-Load Tariff)PG&E-filed revision to Electric Rule 30 creating tariff terms for large transmission-voltage loads (data centers), including minimum-take and collateral provisions.Download
- SB 886 - Data center electricity rates: separate rate classCreates a separate electricity rate class for data centers.Download
- SB6231 - Removes data center equipment replacement tax exemptionRemoves the tax exemption for replacement of data center equipment.Download
- SB 2406 - Data center nondisclosure agreement penaltiesEstablishes penalties for data center nondisclosure agreements.Download
- SB960 - Data center electric cost allocation studyDirects the SCC to determine whether non-data-center customers subsidize data centers.Download
- HB05076 - AI data center energy/water efficiency requirementsConcerns energy and water efficiency requirements for AI data centers.Download
- SB 887California bill removing CEQA categorical exemptions as applied to data center projects.Download
- S08540 - Accountability of Costs for Data Centers ActEstablishes independent classification of service for large energy-use facilities to allocate data center costs.Download
- HB1246 - Prohibits nondisclosure of data center agreementsProhibits nondisclosure of certain agreements related to data centers.Download
- SB 1168 - Data centers: rate structuresEstablishes rate structures applicable to data centers.Download
- CPUC Rulemaking R.26-04-009 - Advanced Rate Design (Large Load / Data Center Cost Allocation)Statewide rulemaking opened 2026, driven by SB 57, addressing cost allocation and rate design for large-load customers including data centers.Download
- CPUC Advice Letter 7785-E / Draft Resolution E-5455 - PG&E Service to Google (San Jose, 250MW)Pending as of Sep 2026 -- PG&E advice letter for a 250MW Google data center in San Jose, protested by the Public Advocates Office over ratepayer cost allocation.Download
- AB2469 - Data centers: water use disclosures.Description comingDownload
- AB1095 - Data centers: waste heat energy.Description comingDownload
- AB93 - Water resources: data centers.Description comingDownload
- SB57 - Electrical corporations: data centers: report.Description comingDownload
- AB2619 - Water resources: data centers.Description comingDownload
- SB978 - Data centers: labor: electricity rates.Description comingDownload
- AB1577 - Data centers: reporting.Description comingDownload
- AB2383 - Electricity: data centers.Description comingDownload
- AB222 - Data centers: power usage effectiveness: cost shifts.Description comingDownload
Site details
- Operator
- Global Stack LLC (MeshClusters)
- County
- Riverside County, CA
- Address
- Perris, CA
- Stage
- Announced
Capacity and size: not on file
Map
Photos
Google Street View · nearby land, not the exact site
California and Texas Announce Restrictions on Data Center DevelopmentBusiness Insider
Newsom signs ‘most comprehensive data center laws’ in USSanta Rosa Press Democrat
California tightens rules on AI data center energy and water useThe Verge
California enacts data center laws giving communities more control over facilitiesCBS News
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Perris
For data center developers