Databank Houston Galleria (HOU5)
Houston, Harris County, TX
DataBank, Ltd. operates Databank Houston Galleria (HOU5) in Houston, TX. Reported capacity is 5.3 MW. DataBank, Ltd operates this data center at 4201 Southwest Freeway, Houston, TX 77027. It opened in 2007, covers 112,000 square feet and has 5.25 MW of IT capacity.
- 5.25 MWPlanned capacity
Project status
- Announced
- Permitting
- Under construction
- Operational
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
This data center is operating.
The stance question is asked on projects still ahead.
What’s next
Election Day is in 10 days.
3:00 PM · TX
American Data Center Private Power Forum 2027
Latest news
Nothing written about this data center yet.
Stories about it, and about Harris County, TX, land here.
Records and documentation
Texas state legislation
- PUCT Docket No. 59475 - Oncor/LCRA Bell County East Switch-Big Hill 765kV Transmission LineFiled March 2026; 122 alternative routes, 835+ protests. Explicitly justified by data-center load concentration in the Temple/Bell/Williamson County corridor; an intervenor has questioned whether specific "Temple Data Centers" were properly included in the load forecast.Download
- PUCT Docket No. 59142 - ERCOT Large Load Interconnection "Batch Zero" ProcessPUCT approved (~June 2026) ERCOT's one-time transitional study process for ≥75MW load interconnection requests; tied to Gov. Abbott's Aug 2026 directive pausing/auditing the queue. CenterPoint reported ~14GW of its own projects positioned in this batch.Download
- PUCT Project No. 58481 - Large Load Interconnection Standards Rulemaking (PURA §37.0561)Statewide rulemaking adopting 16 TAC §25.194, interconnection standards for new/expanding loads ≥75MW (data centers). Adopted 2026 with a flat $100k study fee, eliminated non-refundable interconnection fee.Download
- Economic Development Program Agreement (Seafox) / Tax Abatement & Road Improvements AgreementsMOU-based economic development program agreement (plus a Chapter 312 tax abatement agreement and a road-improvements development agreement) covering a data center project in El Paso.Download
- PUCT Docket No. 59399 - Comanche Peak Power Company Net Metering Application (Amazon)Pending as of mid-2026 -- test case for data center co-location against dispatchable (nuclear) generation. Amazon data center campus paired with the Comanche Peak nuclear plant, Somervell County.Download
Site details
- Operator
- DataBank, Ltd.
- County
- Harris County, TX
- Capacity
- 5.25 MW
- Address
- Houston, TX
- Stage
Size: not on file
Map
Photos
https://encrypted-tbn0.gstatic.com/images?q=tbn:ANd9GcQp7wmDqAw3TuM7JqbgbWCOBuX9j-nki2bl0NQloXvICkJTgrBYe23pEP0&s=10
Google Street View
Google Street View
Google Street View
It took 3 months to get inside this massive Texas data center - here’s what we sawFOX 4 News
Texas AG Ken Paxton Sends Compliance Letters to 156 Data Centers over Water Usage ReportingBreitbart News Network
156 Texas data centers warned to comply with water use reporting requirementsFOX 4 News
Texas Agency Tries To Keep Data Centers Hidden Over Terror FearsNewsweek
Texas puts data center permits on hold.The Verge
Gov. Abbott pauses new data center permits until water, power audit completeCBS News
ComEd customers could pay billions for data center hookups, warns utility watchdog groupShaw Local Enewspapers
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
Other data centers near Houston
For data center developers