Colovore SJC02
Santa Clara, Santa Clara County, CA
Colovore SJC02 is an operating data center in Santa Clara, CA, run by a private operator. The facility is reported at 9 MW with a reported investment of $37 million. Second high-density liquid-cooled site, opened Nov 2024; retrofit of 29,100 sq ft building acquired for $37.2m; AI colocation (Lambda a known customer).
- 9 MWPlanned capacity
Project status
- Announced Nov 3, 2022
- Permitting
- Under construction
- Operational December 2024
Recorded changes
Nothing recorded yet. Follow this project to hear when something changes.
Community sentiment
This data center is operating.
The stance question is asked on projects still ahead.
What’s next
Election Day is in 11 days.
Latest news
Nothing written about this data center yet. The latest from Santa Clara County, CA:
Records and documentation
California state legislation
- CPUC Resolution E-5420 - PG&E Service to STACK Infrastructure (San Jose)Approved PG&E special facilities/service arrangement for a 90MW STACK Infrastructure data center in San Jose.Download
- CPUC Resolution E-5439 - PG&E Service to Microsoft "SJC02" (San Jose)Approved PG&E special facilities/service arrangement for a 90MW Microsoft data center campus in San Jose.Download
- CPUC Application A.24-11-007 - PG&E Electric Rule 30 Revision (Large Transmission-Load Tariff)PG&E-filed revision to Electric Rule 30 creating tariff terms for large transmission-voltage loads (data centers), including minimum-take and collateral provisions.Download
- SB 886 - Data center electricity rates: separate rate classCreates a separate electricity rate class for data centers.Download
- SB6231 - Removes data center equipment replacement tax exemptionRemoves the tax exemption for replacement of data center equipment.Download
- SB 2406 - Data center nondisclosure agreement penaltiesEstablishes penalties for data center nondisclosure agreements.Download
- SB960 - Data center electric cost allocation studyDirects the SCC to determine whether non-data-center customers subsidize data centers.Download
- HB05076 - AI data center energy/water efficiency requirementsConcerns energy and water efficiency requirements for AI data centers.Download
- SB 887California bill removing CEQA categorical exemptions as applied to data center projects.Download
- S08540 - Accountability of Costs for Data Centers ActEstablishes independent classification of service for large energy-use facilities to allocate data center costs.Download
- HB1246 - Prohibits nondisclosure of data center agreementsProhibits nondisclosure of certain agreements related to data centers.Download
- SB 1168 - Data centers: rate structuresEstablishes rate structures applicable to data centers.Download
- CPUC Rulemaking R.26-04-009 - Advanced Rate Design (Large Load / Data Center Cost Allocation)Statewide rulemaking opened 2026, driven by SB 57, addressing cost allocation and rate design for large-load customers including data centers.Download
- CPUC Advice Letter 7785-E / Draft Resolution E-5455 - PG&E Service to Google (San Jose, 250MW)Pending as of Sep 2026 -- PG&E advice letter for a 250MW Google data center in San Jose, protested by the Public Advocates Office over ratepayer cost allocation.Download
- AB2469 - Data centers: water use disclosures.Description comingDownload
- AB1095 - Data centers: waste heat energy.Description comingDownload
- AB93 - Water resources: data centers.Description comingDownload
- SB57 - Electrical corporations: data centers: report.Description comingDownload
- AB2619 - Water resources: data centers.Description comingDownload
- SB978 - Data centers: labor: electricity rates.Description comingDownload
- AB1577 - Data centers: reporting.Description comingDownload
- AB2383 - Electricity: data centers.Description comingDownload
- AB222 - Data centers: power usage effectiveness: cost shifts.Description comingDownload
Site details
- Operator
- Colovore
- County
- Santa Clara County, CA
- Capacity
- 9 MW
- Address
- Santa Clara, CA
- Stage
Size: not on file
Map
Photos
Santa Clara County among top locations for data centers in US, report showsThe Mercury News
Santa Clara County among top locations for data centers in US, report showsSanta Rosa Press Democrat
San Jose Spotlight: San Jose Data Center Advances After PushbackSFGATE
San Jose data hub that is site of Nvidia chip tests wins final city OKThe Mercury News
San Jose Spotlight: Gilroy Extends Moratorium On Data Center ProjectsSFGATE
San Jose to present first draft of data center standardsThe Mercury News
San Jose Spotlight: Data Center Company To Acquire Former South San Jose Ibm SiteSFGATE
San Jose Spotlight: Data Center Developers Share Plans At San Jose Town HallSFGATE
San Jose data center could open in 2030 if project wins city approvalThe Mercury News
California and Texas Announce Restrictions on Data Center DevelopmentBusiness Insider
Newsom signs ‘most comprehensive data center laws’ in USSanta Rosa Press Democrat
California tightens rules on AI data center energy and water useThe Verge
California enacts data center laws giving communities more control over facilitiesCBS News
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near Santa Clara
For data center developers