AWS Project Spectrum (Hood County)
Hood County, TX
AWS Project Spectrum (Hood County) is a planned data center in Hood County, TX, with Amazon Web Services named as the developer. AWS-linked 'Project Spectrum' campus at 2300 Coates Road in Hood County, planned as a 21-building campus across ~1,265 acres, powered via Luminant/Vistra from the neighboring Comanche Peak nuclear plant. Hood County Commissioners Court voted 3-0 on May 26, 2026 that AWS had met approval conditions (drainage, traffic, endangered species, water-use studies). This appears to be a separate site/phase from the already-tracked 'AWS Project Spectrum' entry in Glen Rose/Somervell County (18 buildings, ~435 acres) -- different building count, acreage, and county approval process -- though both share the Project Spectrum name and draw power from Comanche Peak, so some relationship between the two is likely. [Reviewed 2026-10-09: verified] Hood County Commissioners Court voted 3-0 on May 26, 2026, approving AWS Project Spectrum at 2300 Coates Road after confirming the company met established conditions for drainage, traffic, species, and water studies. Source: https://www.yahoo.com/news/politics/articles/law-hood-county-oks-plans-210514110.html.
Project status
- Announced
- Permitting
- Under constructionNot yet
- OperationalNot yet
Recorded changes
Community sentiment
Should this project be built?
What’s next
Election Day is in 10 days.
4:00 AM · TX
Hood County: County Commissioners7:00 AM · TX
Hood County: Commissioners Court4:00 AM · TX
Hood County: County Commissioners7:00 AM · TX
Hood County: Commissioners Court4:00 AM · TX
Hood County: County Commissioners7:00 AM · TX
Hood County: Commissioners Court
Latest news
Nothing written about this data center yet. The latest from Hood County, TX:
Records and documentation
Texas state legislation
- PUCT Docket No. 59475 - Oncor/LCRA Bell County East Switch-Big Hill 765kV Transmission LineFiled March 2026; 122 alternative routes, 835+ protests. Explicitly justified by data-center load concentration in the Temple/Bell/Williamson County corridor; an intervenor has questioned whether specific "Temple Data Centers" were properly included in the load forecast.Download
- PUCT Docket No. 59142 - ERCOT Large Load Interconnection "Batch Zero" ProcessPUCT approved (~June 2026) ERCOT's one-time transitional study process for ≥75MW load interconnection requests; tied to Gov. Abbott's Aug 2026 directive pausing/auditing the queue. CenterPoint reported ~14GW of its own projects positioned in this batch.Download
- PUCT Project No. 58481 - Large Load Interconnection Standards Rulemaking (PURA §37.0561)Statewide rulemaking adopting 16 TAC §25.194, interconnection standards for new/expanding loads ≥75MW (data centers). Adopted 2026 with a flat $100k study fee, eliminated non-refundable interconnection fee.Download
- Economic Development Program Agreement (Seafox) / Tax Abatement & Road Improvements AgreementsMOU-based economic development program agreement (plus a Chapter 312 tax abatement agreement and a road-improvements development agreement) covering a data center project in El Paso.Download
- PUCT Docket No. 59399 - Comanche Peak Power Company Net Metering Application (Amazon)Pending as of mid-2026 -- test case for data center co-location against dispatchable (nuclear) generation. Amazon data center campus paired with the Comanche Peak nuclear plant, Somervell County.Download
Site details
- Operator
- Amazon Web Services
- County
- Hood County, TX
- Address
- Hood County, TX
- Stage
- Planned
Capacity and size: not on file
Map
Photos
RenderingRendering: Data Center Dynamics
RenderingRendering: Data Center Dynamics
Google Street View
Google Street View
Google Street View
Aerial imageryAerial imagery: USGS The National Map (public domain)
Hood County commissioners vote to deny data center proposalThe Dallas Morning News
Hood County residents sue city of Granbury over proposed data centerCBS News
Granbury leaders hired lawyer to sue city, halting recall petition over data center concernsFOX 4 News
Granbury residents stage walkout during city council meeting amid data center controversyFOX 4 News
It took 3 months to get inside this massive Texas data center - here’s what we sawFOX 4 News
Texas AG Ken Paxton Sends Compliance Letters to 156 Data Centers over Water Usage ReportingBreitbart News Network
156 Texas data centers warned to comply with water use reporting requirementsFOX 4 News
Texas Agency Tries To Keep Data Centers Hidden Over Terror FearsNewsweek
Texas puts data center permits on hold.The Verge
Gov. Abbott pauses new data center permits until water, power audit completeCBS News
ComEd customers could pay billions for data center hookups, warns utility watchdog groupShaw Local Enewspapers
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
Other data centers near Hood County
For data center developers