Aunalytics South Bend Datacenter (AUSB)
South Bend, St. Joseph County, IN
Aunalytics South Bend Datacenter (AUSB) is in operation in South Bend, IN. Reported capacity is 10 MW. Aunalytics operates this data center at 1440 Ignition Drive, South Bend, IN 46601. It opened in 2012 and has 10 MW of capacity.
- 10 MWPlanned capacity
Project status
- Announced
- Permitting
- Under construction
- Operational
Recorded changes
Community sentiment
This data center is operating.
The stance question is asked on projects still ahead.
What’s next
Election Day is in 10 days.
Latest news
Nothing written about this data center yet. The latest from St. Joseph County, IN:
Records and documentation
Indiana state legislation
- IURC Cause No. 46097 - Indiana Michigan Power (AEP) Large-Load TariffIURC approved (Feb 2025) a modified large-load tariff for new/expanding loads >70MW single-site: 12-year minimum term, 80% minimum-billing-demand floor, 24-month collateral, exit fee. Settling parties included OUCC, Amazon, Google, Microsoft, Data Center Coalition -- driven by AWS's ~$11B "Project Rainier" (New Carlisle) and Google's Fort Wayne data center.Download
- IURC Cause No. 46183 - NIPSCO GenCo Dedicated-Generation FrameworkIURC approved (Sept 2025, reaffirmed Nov 2025) a settlement letting GenCo (a NIPSCO affiliate) own/build dedicated generation for large loads so existing customers aren't cost-burdened. Built to serve Amazon data centers.Download
- IURC Cause No. 46322 - NIPSCO/GenCo Special Contract + PPA (Amazon)Order issued June 2026 -- GenCo to build two 1.3GW gas plants + 400MW/4hr battery storage, power delivery to Amazon starting Jan 2027 ramping to 2.4GW by 2032. NIPSCO projects ~$1B ratepayer savings.Download
- IURC Cause No. 45647 - Duke Energy Indiana TDSIC (Meta Jeffersonville Cost Recovery)Ongoing transmission/distribution infrastructure cost-recovery docket; ~$216M of network upgrades tied to the Meta Jeffersonville data center were recovered through this mechanism, later reviewed by the Indiana Supreme Court on cost allocation.Download
- SB0079 - Data center development.Description comingDownload
- HB1245 - IURC study of data centers.Description comingDownload
Site details
- Operator
- Aunalytics
- County
- St. Joseph County, IN
- Capacity
- 10 MW
- Address
- South Bend, IN
- Stage
Size: not on file
Map
Photos
https://www.datacenters.com/aunalytics-south-bend
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
Google Street View
St. Joseph County Council votes to begin data center ban processSouth Bend Tribune
Executive order bars South Bend city staff signing data center NDAsSouth Bend Tribune
South Bend mayor signs executive order prohibiting data center NDAsSouth Bend Tribune
An $8 billion Treasury break helped Meta’s tax rate hit 2%. Senators want data center tax answersFortune
The states with the fewest and most data centers, rankedBusiness Insider
Finns Are Seething After Google Illegally Toppled 250,000 Trees for a Data CenterMother Jones
Google offer to pay others to help data center powerArkansas Online
This bill would make data centers pay their own way for powerSalt Lake City Deseret News
Other data centers near South Bend
For data center developers